{"product_id":"on-site-survey-multiple-chargers","title":"On-Site Analysis - Multiple Chargers","description":"\u003cp data-start=\"190\" data-end=\"456\"\u003eFor condominiums, office buildings and underground parking lots, installing multiple electric car charging stations requires careful, forward-looking planning. During the on-site assessment, our experts examine the electrical capacity of the building, the expansion possibilities and the optimal positioning of the charging stations, in order to be able to propose a scalable and safe charging infrastructure in the long term.\u003c\/p\u003e\n\u003cp data-start=\"458\" data-end=\"757\"\u003eWe offer dynamic load balancing, individual metering and billing, and a scalable and scalable system design. At the end of the assessment, you will have a clear picture of the number of charging points that can be safely implemented and the estimated investment costs.\u003c\/p\u003e\n\u003cp data-start=\"759\" data-end=\"838\"\u003eOur national network of electricians can carry out the assessment within 5 working days.\u003c\/p\u003e\n\u003cp data-start=\"840\" data-end=\"962\"\u003eThe evaluation is non-binding, but if you order the execution of the work from us, its cost will be deducted from the total amount of the installation.\u003c\/p\u003e","brand":"EVIONOR","offers":[{"title":"Default Title","offer_id":53923402121545,"sku":null,"price":49900.0,"currency_code":"HUF","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0972\/8897\/8761\/files\/b2b-section-last.webp?v=1768322786","url":"https:\/\/evionor.hu\/en\/products\/on-site-survey-multiple-chargers","provider":"EVIONOR","version":"1.0","type":"link"}