EVIONOR
On-site measurements - one loader
During the on-site assessment, our experts review the electrical specifications of the car park, garage and building to recommend the appropriate charging system and design.
We analyze the network capacity, identify the ideal charging locations and cables, and if necessary, install an electric meter. After the assessment, you will have a clear picture of the type of charger that can be safely and cost effectively installed.
Our national network of qualified electricians carry out the on-site assessment within 5 working days.
The on-site assessment does not involve an obligation to purchase a charger, but in the case of a charger and installation order from us, the on-site assessment fee will be deducted from the installation price.
Intelligent control
Intelligent control automatically adapts to tariffs and daily routine to always charge at the lowest price. It can be controlled from the app, with dynamic load distribution protects the grid and also cooperates with solar panels.

